How Our Video Draw Process Works on a Fix and Flip Loan

The draw process is where a lot of hard money deals quietly fall apart. Not at closing, not at the final sale, but somewhere in the middle when a crew is sitting idle and the lender still hasn't released funds. We built our video draw process specifically because we watched that happen to borrowers over and over again, and we knew there was a better way.

Key Takeaways

  • Our video draw process means you send a walkthrough video of completed work and get funded the next day.
  • No invoices, no lien releases, no third-party inspector to schedule and wait on.
  • The video goes directly to Chris or Flynt. There is no committee, no portal review queue, no delay.
  • This is possible because we lend our own capital. No one above us has to approve the release.
  • Draw stalls cost real money: idle crews, rebooking delays, and interest that keeps accruing while you wait.

In This Article

What Draw Hell Actually Looks Like

I've heard a version of this story more times than I can count. A flipper in Knoxville goes with a lender who looked cheaper on paper. Things move fine at the start.

Then they finish the first phase of work, they request a draw, and the clock starts.

First, the lender asks for itemized invoices from every trade. Then signed lien releases.

Then a third-party inspector has to get scheduled, drive out to the property, write up a report, and send it back.

By the time the funds move, three to five business days have passed. Sometimes longer in the spring and fall when every inspector in East Tennessee is booked out.

"Maybe it took, maybe they required invoices and receipts or lien releases or they had to send a third party inspector and it took three to five days where we just need videos and we get it to them the next day."

Chris Davis, Approach Lending

And here is what nobody talks about in that window: your crew does not wait. Skilled trades book the next job while they're still finishing yours. If your draw takes a week to clear, your framer has moved on.

Rebooking them in a busy season can cost you two to three weeks of schedule, not just the five days you lost waiting on the inspector.

We've had borrowers come back to us specifically because of this. They left thinking another private money lender was cheaper, found out the fees were different than quoted and the draws were a problem, and came back mid-project or on the next deal. As Chris put it: "We've had this happen several times where someone called us, went with someone they thought was cheaper, ended up not really being cheaper, and it was more difficult, so they returned to us, especially on the construction draw side."

How Our Video Draw Process Works, Step by Step

We designed this to be as simple as possible for the borrower, because your job is running the project, not managing a document checklist for us.

Step 1: Scope the work upfront

Before any work starts, you itemize the scope. What phases are planned, what trades are involved, what each phase looks like when it's done. This is not a bureaucratic form.

It is a practical conversation about the project so that we all agree on what "complete" means before the first draw request comes in.

We do not do full appraisals on the front end. We send third parties to capture photos and video of the property and pair that with our own read on value. That is the underwriting step and it is separate from the draw process entirely.

Don't mix those two up. The borrower-submitted video is only for draws, not for loan approval.

Step 2: Complete a phase of work

You do the work. Your crew finishes a phase, whether that's demo and rough framing, or a full kitchen gut, or new HVAC and electrical. The milestone is real, visible, and complete.

Step 3: Walk it on video and send it in

You pick up your phone, walk through the completed work, and send the video directly to Chris or Flynt. No upload portal, no third-party inspection company, no paperwork packet. Just a clear walkthrough of what's done.

The video is the inspection. We know what finished work looks like. We've both done deals ourselves, and we can tell from a walkthrough whether a phase is genuinely complete or whether someone is pulling a draw on half-finished work.

This is not a rubber stamp. It is a real review, done fast.

Step 4: Get funded the next day

That's it. The video draw process funds the next day. No invoices, no lien releases, no scheduling delay, no inspector driving out from Knoxville to look at a bathroom in Harriman.

Your crew gets paid. They stay on the job. The project keeps moving.

Why We Can Fund the Next Day (And Most Lenders Can't)

Most lenders need to satisfy a capital partner, a committee, or an institutional requirement before releasing draw funds. That is where the three-to-five-day window comes from. It is not the inspection taking that long.

It is the approval chain behind the inspection.

We lend our own money. Chris and Flynt are the decision makers on every loan and every draw. There is no one above us to ask.

When we review the video and say the funds move, the funds move. That is the structural reason our video draw process works the way it does.

We have funded over 300 loans totaling more than $53 million since formal lending operations began in 2021. Roughly 55 to 60 percent of our borrowers come back for another deal. A lot of that retention is built right here, in how draws feel in the middle of a project when the pressure is on.

Why institutional lenders can't match this

A national private lender or institutional hard money shop runs draws through a servicing operation. The servicing team follows a protocol: invoice verification, lien waiver collection, third-party inspection order, internal review, disbursement approval. Each handoff adds a day.

The protocol exists because their capital has rules attached to it.

We do not have those rules. Our capital is ours. So our video draw process can be exactly what it is: watch the video, fund the draw, done.

The One Thing That Stalls Draws More Than Anything Else

On permitted work, the delay is on the permit, not on us. This is true for every lender, and it is worth saying plainly so there are no surprises mid-project.

In Knoxville proper, electrical, plumbing, mechanical, and structural work goes through the City of Knoxville Codes Administration. Deals in unincorporated Knox County run through the county's own codes office. Either way, if a phase requires a permit and inspection, the municipal inspector has to sign off before that phase is considered complete.

We can not release a draw on permitted work that hasn't passed inspection. That is not arbitrary on our part. Releasing draws on permitted work that hasn't passed inspection creates risk for everyone, including you.

What we can do is move the moment that permit clears.

You send us the video showing the passed inspection, we fund it the next day.

Plan your draw schedule around your permit timeline, especially on full rehabs with significant mechanical work. Knoxville inspectors book out, particularly in spring and fall. Pulling permits early and scheduling inspections before you finish the phase is the move that keeps projects on timeline.

The Real Cost of a Slow Draw

Here is the math that flippers sometimes undercount when they're comparing lenders on rate. A five-day draw delay is not just five days of inconvenience. It is five days of interest accruing on the full loan balance.

On a $250,000 private money loan at a competitive rate, that is real carrying cost every week the project runs long.

Add crew rebooking risk. A skilled electrician in the Knoxville market books weeks out during the renovation season. If your draw stalls and your electrician's crew moves to another job, you are not getting them back next week.

You might wait two to three weeks for their next availability. That is two to three weeks of additional interest, utilities, insurance, and property taxes on a margin that was calculated assuming a clean timeline.

The rate on the loan matters. But the total cost of the project, measured in days and dollars from purchase to sale, is what actually hits your profit number. A lender with a slightly higher stated rate who funds draws the next day can easily be the cheaper choice when the project is done.

The carrying cost calculation most flippers miss

Think about it this way. If your project has four draws and each one takes five days to fund under a traditional process, that is twenty days of delay baked in before any permitting slowdowns or crew scheduling gaps. Twenty days of interest at hard money rates on a project with thin margins is a real line item.

Our video draw process compresses that to near zero on each cycle.

We're not going to tell you we're the cheapest option in the market, because that's not the point. What we can tell you is that our rates run from 9.99 to 12.99 percent and the draw process does not add hidden carrying cost to every phase of your project. Those two things together are what you're actually comparing.

The Final Draw: What We Call the Earnout

Most draws happen in the middle of the project as phases complete. The last one works a little differently, and it is worth understanding before you get there.

When the work is done and the project is ready for sale or refi, we do what Chris calls the final completion draw, or the earnout. This is the final release of rehab holdback funds, tied to verified completion of the full scope. You walk the finished property on video, send it over, and the earnout funds the next day like any other draw.

The earnout is not a penalty or a hurdle. It is just the logical close of the draw process: one last confirmation that everything scoped at the start got done, and then the remaining funds release. For borrowers running a BRRRR, this typically lines up with the appraisal window before the refi.

For flippers, it lines up with final punch list and listing prep.

What happens if there are scope changes mid-project?

Rehabs rarely go exactly as planned. A wall comes down and you find something unexpected. A subfloor needs to be replaced that wasn't in the original scope.

This happens, and we have seen it on projects in Rockwood, in Oliver Springs, in Harriman, across every kind of property we fund.

When scope changes, the conversation comes back to Chris or Flynt directly. Because there is no committee, we can make a decision on a scope adjustment fast. That is the same structural advantage that makes the video draw process work.

The people who control the capital are also the people you can actually get on the phone.

Frequently Asked Questions

How do renovation draws work with Approach Lending?

You walk the completed phase of work on video and send it directly to Chris or Flynt. The draw funds the next day. There are no invoices to compile, no lien releases to collect, and no third-party inspector to schedule.

The video draw process is the whole system.

How many draws are typical on a fix and flip loan?

It depends on the scope of the project. Lighter cosmetic rehabs often run three draws or fewer. Full gut rehabs with multiple trade phases may use more.

We size the draw schedule based on the actual scope of work at the start of the project, not a one-size template.

Do I need to submit invoices or lien releases to get a draw funded?

No. Our video draw process does not require invoices, lien releases, or any document packet. The video walkthrough of the completed work is what triggers the draw review and next-day funding.

What is the earnout on a fix and flip loan?

The earnout is what we call the final completion draw. When the full scope of work is done and you're ready for sale or refinance, you send a video of the finished property and we release the remaining holdback funds the next day. It closes out the draw process the same way every other draw works.

Why can Approach Lending fund draws the next day when other lenders take 3 to 5 days?

We lend our own capital. Chris and Flynt make every draw decision directly, with no committee or capital partner approval required. Most lenders run draws through a servicing operation with multiple handoff steps.

We skip all of that because there is no one above us who has to say yes first.

Next
Next